This page simply reformats the Flickr public Atom feed for purposes of finding inspiration through random exploration. These images are not being copied or stored in any way by this website, nor are any links to them or any metadata about them. All images are © their owners unless otherwise specified.
This site is a busybee project and is supported by the generosity of viewers like you.
Gliding down Wingello Bank, Very late running 1WM7 loaded QUBE steel led by QL005, QL015 and QL010 passes through Wingello station on a cold Autumn morning
This train has incurred delays of 6 Hours and 17 minutes. The reason for this is a coupler snap at Picton that morning. The train was stuck there for some time, which wreaked havoc on the entire Southern Highlands Line (SHL). The train was repaired and the service continued on.
Arriving at Wingello at 10:49am where it was scheduled at 4:32am
Join my group!
www.flickr.com/groups/14852200@N24/pool/